    • Thank you for posting up the results from the sar. The PCN is not compliant with the Protection of Freedoms Act 2012 Schedule 4. Under Section 9 [2][a] they are supposed to specify the parking time. the photographs show your car in motion both entering and leaving the car park thus not parking. If you have to do a Witness Statement later should they finally take you to Court you will have to continue to state that even though you stayed there for several hours in a small car park and the difference between the ANPR times and the actual parking period may only be a matter of a few minutes  nevertheless the CEL have failed to comply with the Act by failing to specify the parking period. However it looks as if your appeal revealed you were the driver the deficient PCN will not help you as the driver. I suspect that it may have been an appeal from the pub that meant that CEL offered you partly a way out  by allowing you to claim you had made an error in registering your vehicle reg. number . This enabled them to reduce the charge to £20 despite them acknowledging that you hadn't registered at all. We have not seen the signs in the car park yet so we do not what is said on them and all the signs say the same thing. It would be unusual for a pub to have  a Permit Holders Only sign which may discourage casual motorists from stopping there. But if that is the sign then as it prohibits any one who doesn't have a permit, then it cannot form a contract with motorists though it may depend on how the signs are worded.
    • Defence and Counterclaim Claim number XXX Claimant Civil Enforcement Limited Defendant XXXXXXXXXXXXX   How much of the claim do you dispute? I dispute the full amount claimed as shown on the claim form.   Do you dispute this claim because you have already paid it? No, for other reasons.   Defence 1. The Defendant is the recorded keeper of XXXXXXX  2. It is denied that the Defendant entered into a contract with the Claimant. 3. As held by the Upper Tax Tribunal in Vehicle Control Services Limited v HMRC [2012] UKUT 129 (TCC), any contract requires offer and acceptance. The Claimant was simply contracted by the landowner to provide car-park management services and is not capable of entering into a contract with the Defendant on its own account, as the car park is owned by and the terms of entry set by the landowner. Accordingly, it is denied that the Claimant has authority to bring this claim. 4. In any case it is denied that the Defendant broke the terms of a contract with the Claimant. 5. The Claimant is attempting double recovery by adding an additional sum not included in the original offer. 6. In a further abuse of the legal process the Claimant is claiming £50 legal representative's costs, even though they have no legal representative. 7. The Particulars of Claim is denied in its entirety. It is denied that the Claimant is entitled to the relief claimed or any relief at all. Signed I am the Defendant - I believe that the facts stated in this form are true XXXXXXXXXXX 01/05/2024   Defendant's date of birth XXXXXXXXXX   Address to which notices about this claim can be sent to you  
    • pop up on the bulk court website detailed on the claimform. [if it is not working return after the w/end or the next day if week time] . When you select ‘Register’, you will be taken to a screen titled ‘Sign in using Government Gateway’.  Choose ‘Create sign in details’ to register for the first time.  You will be asked to provide your name, email address, set a password and a memorable recovery word. You will be emailed your Government Gateway 12-digit User ID.  You should make a note of your memorable word, or password as these are not included in the email.<<**IMPORTANT**  then log in to the bulk court Website .  select respond to a claim and select the start AOS box. .  then using the details required from the claimform . defend all leave jurisdiction unticked  you DO NOT file a defence at this time [BUT you MUST file a defence regardless by day 33 ] click thru to the end confirm and exit the website .get a CPR 31:14 request running to the solicitors https://www.consumeractiongroup.co.uk/forum/showthread.php?486334-CPR-31.14-Request-to-use-on-receipt-of-a-PPC-(-Private-Land-Parking-Court-Claim type your name ONLY no need to sign anything .you DO NOT await the return of paperwork. you MUST file a defence regardless by day 33 from the date on the claimform.
    • well post it here as a text in a the msg reply half of it is blanked out. dx  
  • Recommended Topics

  • Our picks

    • If you are buying a used car – you need to read this survival guide.
        • Like
      • 1 reply
    • Hello,

      On 15/1/24 booked appointment with Big Motoring World (BMW) to view a mini on 17/1/24 at 8pm at their Enfield dealership.  

      Car was dirty and test drive was two circuits of roundabout on entry to the showroom.  Was p/x my car and rushed by sales exec and a manager into buying the mini and a 3yr warranty that night, sale all wrapped up by 10pm.  They strongly advised me taking warranty out on car that age (2017) and confirmed it was honoured at over 500 UK registered garages.

      The next day, 18/1/24 noticed amber engine warning light on dashboard , immediately phoned BMW aftercare team to ask for it to be investigated asap at nearest garage to me. After 15 mins on hold was told only their 5 service centres across the UK can deal with car issues with earliest date for inspection in March ! Said I’m not happy with that given what sales team advised or driving car. Told an amber warning light only advisory so to drive with caution and call back when light goes red.

      I’m not happy to do this, drive the car or with the after care experience (a sign of further stresses to come) so want a refund and to return the car asap.

      Please can you advise what I need to do today to get this done. 
       

      Many thanks 
      • 81 replies
    • Housing Association property flooding. https://www.consumeractiongroup.co.uk/topic/438641-housing-association-property-flooding/&do=findComment&comment=5124299
        • Like
      • 161 replies
    • We have finally managed to obtain the transcript of this case.

      The judge's reasoning is very useful and will certainly be helpful in any other cases relating to third-party rights where the customer has contracted with the courier company by using a broker.
      This is generally speaking the problem with using PackLink who are domiciled in Spain and very conveniently out of reach of the British justice system.

      Frankly I don't think that is any accident.

      One of the points that the judge made was that the customers contract with the broker specifically refers to the courier – and it is clear that the courier knows that they are acting for a third party. There is no need to name the third party. They just have to be recognisably part of a class of person – such as a sender or a recipient of the parcel.

      Please note that a recent case against UPS failed on exactly the same issue with the judge held that the Contracts (Rights of Third Parties) Act 1999 did not apply.

      We will be getting that transcript very soon. We will look at it and we will understand how the judge made such catastrophic mistakes. It was a very poor judgement.
      We will be recommending that people do include this adverse judgement in their bundle so that when they go to county court the judge will see both sides and see the arguments against this adverse judgement.
      Also, we will be to demonstrate to the judge that we are fair-minded and that we don't mind bringing everything to the attention of the judge even if it is against our own interests.
      This is good ethical practice.

      It would be very nice if the parcel delivery companies – including EVRi – practised this kind of thing as well.

       

      OT APPROVED, 365MC637, FAROOQ, EVRi, 12.07.23 (BRENT) - J v4.pdf
        • Like
  • Recommended Topics

Received Court Claim from Builder


HP Mum
style="text-align: center;">  

Thread Locked

because no one has posted on it for the last 2012 days.

If you need to add something to this thread then

 

Please click the "Report " link

 

at the bottom of one of the posts.

 

If you want to post a new story then

Please

Start your own new thread

That way you will attract more attention to your story and get more visitors and more help 

 

Thanks

Recommended Posts

  • Replies 86
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

I have searched the forum but can't find definitive answer.

If the claimant does not send me the dq by the determining date then what happens?

If late - ie I receive their dq a few days after the court deadline - can i ask for the claim to be stayed?

Or if even a few days late the judge will take a view?

 

If claimant does not send the dq to the court by the deadline is it automatically thrown out? Or again the judge may be lenient?

Link to post
Share on other sites

staying is auto not something you can ask for..

 

a few days late wont matter..

 

unless you mean strike out..

please don't hit Quote...just type we know what we said earlier..

DCA's view debtors as suckers, marks and mugs

NO DCA has ANY legal powers whatsoever on ANY debt no matter what it's Type

and they

are NOT and can NEVER  be BAILIFFS. even if a debt has been to court..

If everyone stopped blindly paying DCA's Tomorrow, their industry would collapse overnight... 

Link to post
Share on other sites

I checked other threads here.

 

Found this:

 

Home»Courts»Procedure rules»Civil»Rules & Practice Directions»PART 26 - CASE MANAGEMENT – PRELIMINARY STAGE

PART 26 - CASE MANAGEMENT – PRELIMINARY STAGE

 

7A) If a claim is a claim to which rule 26.2A applies and a party does not comply with the notice served under rule 26.3(1) by the date specified –

 

(a) the court will serve a further notice on that party, requiring them to comply within 7 days; and

 

(b) if that party fails to comply with the notice served under subparagraph (a), the party’s statement of case will be struck out without further order of the court.

 

(8) If a claim is a claim to which rule 26.2 applies and a party does not comply with the notice served under rule 26.3(1) by the date specified, the court will make such order as it considers appropriate, including –

 

(a) an order for directions;

 

(b) an order striking out the claim;

 

© an order striking out the defence and entering judgment; or

 

(d) listing the case for a case management conference.

 

SO - does this mean that the deadline isn't really a deadline???

That the court will give the claimant a further 7 days to submit their dq? (And if not received by then, it will be struck out)

Or can I just write and ask for the claim to be struck out because the claimant missed the dq deadline? A deadline is a deadline right??!!

Link to post
Share on other sites

SO - does this mean that the deadline isn't really a deadline???

That the court will give the claimant a further 7 days to submit their dq? (And if not received by then, it will be struck out)

Or can I just write and ask for the claim to be struck out because the claimant missed the dq deadline? A deadline is a deadline right??!!

 

I'm sure legal brains will be along soon, but from what I've read on our legal and other forums, some leeway is given with submitting papers. Please bear with us until the people in the know can get here.

 

 

HB

Illegitimi non carborundum

 

 

 

Link to post
Share on other sites

  • 2 weeks later...

I received papers 4 days late.

 

However, clearly the specified deadline being missed did not matter to the courts as I now have been given a tentative mediation appointment. Before that gets confirmed the mediator wants to talk to both parties. So I need to prepare my case over this next week; need to be very clear on why I do not accept his bill; need to be very clear on the issue of Severance.

Link to post
Share on other sites

  • 2 weeks later...

update:

I have a mediation call scheduled for late this week.

 

I am going to work on my defence over next 2 days - so I am clear of my line of argument against his bill.

 

poor quality of the work

the plans which were submitted were incomplete

the contract is "not a severable" contract

the claimant is not entitled to levy a pro rata charge - on basis that a new planner can not simply add the missing parts to the claimant's drawings / the project has to be started again from scratch.

 

I am just not 100% clear on what "severable" and "not severable" means??

I have looked it up. I am just not sure about it. But understand enough to realise it is a strong line of argument to follow and discuss with the mediator.

 

one other thing - will the mediator understand? If the mediator doesn't follow this legal line of defence then perhaps this will need to go to court anyway?

Link to post
Share on other sites

Is this correct??:

 

Severable = a service that is recurring, where someone realizes a benefit at the time, even if the contract has not been completed. If such service can be separated into components that independently provide value to someone's needs, it is considered 'severable'

 

Non-Severable = a service that is a single under-taking, which can not be feasibly separated into components, where someone does not realize a benefit at the time. If such service needs to produce a single or unified outcome, product or report it is considered 'non-severable'.

 

So - my builder's 'service' was to provide drawings. Such drawings would subsequently be used for further research and to obtain pre-planning/ planning permission. With incomplete drawings the 'service' was of no benefit to me - and is thus considered 'non-severable'.

Is this right?

 

Without correct drawings, the builder couldn't do any other work. Yet, upon checking the figures, he has invoiced me for 60% of his quote.

I have to be clear on my line of 'argument' - by end of today.

 

I think it boils down to - he did do drawings but they were incomplete - could I use the incomplete drawings to give to another builder/ surveyor? - Maybe - but most builders would probably not want to rely on another builder's measurements/ drawings. So would a mediator consider I should pay something towards what he drew or not? Do his drawings have any value to me in current state? That's the million dollar question...

Link to post
Share on other sites

Thats my understanding of Severable and Non-Severable

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

  • Recently Browsing   0 Caggers

    • No registered users viewing this page.

  • Have we helped you ...?


×
×
  • Create New...