Jump to content


  • Tweets

  • Posts

    • Hearing held today in court. I attended in person and Evri had an advocate attend on their behalf to defend their position that my contract is with Packlink and not with them. I also provided a copy of Evri's terms and conditions which explains that a contract is entered into when a parcel is sent with Evri. The judge pointed this out to the Advocate and agreed there is a contract between me and Evri under the Ts and Cs. The judge explained that while Packlink are responsible for organising the delivery of the item, it is Evri who are responsible for handling the goods and delivering them, and therefor Evri has a responsibility to handle the goods with reasonable care and skill. So am pleased to say the judge found in my favour. Hearing lasted about 75mins. Evri has been ordered to make payment within 21 days. Also nice to meet @jk2054 in person.
    • Good morning,    I just wanted to update you on the situation.    I have visits piling up with my current employment and they need doing before I finish at the end of this month.  I am moving to Wiltshire in 3 weeks for a new job helping care homes with their Dementia patients. I tried to work it out and at a guess I will be doing about 20-25,000 miles a year. So need a vehicle that can cope with that mileage, my old car would have done it easy but 🤷‍♂️ I have taken out a loan and got a friend to find me a reliable car that can cope with the miles and hasn't been written off in the past.   I phoned Adrian flux to see if I could use the last months insurance on a new car I have bought, the girl I spoke to phoned Markerstudy and asked them but they said no, my new car doesn't have any modifications.    I had an email from someone who saw one of my appeals for information, they live near the site of the accident and know a nearby farmer who has a security camera at his entrance that catches the traffic and specifically registration plates as he has been robbed before. They said they would reach out for me and see if he still has the data. Unfortunately it wont catch the scene of the crash.   The Police phoned me and said they were closing the report I made, even if they found footage of the vehicle at the time I said the actual incident would be my word vs theirs.  My first response was I am sure google maps would show that they turned around at that location which would verify my version of events, but upon reflection I do understand, I have seen people doing make up with both hands while driving, eating from a bowl steering with their knees and veering all over the place. I am sure some of these people go off the road and claim that someone forced them off.    Markerstudy phoned me yesterday to say that my car is now at Copart, the £80 tank of Vpower diesel was emptied on entry to the site for safety reasons, which I get but it sucks.  It is awaiting being assessed and shouldn't be too long, which is a relief.  I am really glad things do not seem to be going the way of the other stories and they seem to moving quickly.   However I was informed that my car was a structural write off before I bought it - this destroyed me, I was almost sick.  and this is going to affect any offer of money - after hearing the first statement this didn't affect me.   They need to wait for the assessor to check it over but it is highly likely to be written off and the maximum they can offer is £2300.  I was desperate for a car as I was working for an agency at the time, no work no pay, and did not do a vehicle check because I didn't know about them.  The seller did not tell me that it had been structurally written off, he told me that it had the front wing damaged while parked and was repaired at an approved repairer.  Markerstudy records state that it was sold at auction, no record of repair at an approved repairer.  I bought it bank transfer with hand written receipt.    It gets worse.    It turns out my airbags should of gone off. For some reason they are not working. I think we can figure out why.  If I had hit that car head on and had no airbags.    Some good news.    I can arrange a time with Copart to go and take my stereo equipment and any personal items that are left in the car only. I cant live without music and need quality sound, my speakers and amps are Hertz and JLaudio, (no I am not a boy racer with booming subs, I am an audiophile on a budget) I was really worried I wouldn't get them back so this is a huge relief for me. It is stuff I have built up over years of saving and collecting. Everything to do with the vehicle and mods I have declared need to stay to be assessed.   The accident has gone as a fault on my record, I have to remove 2 years NCB which means I still have some to declare which is good.  So it appears at this point that it may be resolved quickly, not in the way I was hoping, but not as bad as I presumed it was going to be based upon that tow truck drivers attitude and behaviour and the horror stories I read.   I am not going to buy the car back and try to make money with all the parts on it, I don't have the time or energy.   I may need an xray on my back and neck.  The whole situation has left me feeling physically sick, drained and I need it done.   The lesson learnt from this  -  My conscience is 100% clear, my attitude to safety and strong sense of personal responsibility - A rated tyres even if on credit card, brake fluid flush every year, regular checks of pads and discs, bushes etc, made avoiding what I believed to be a certain broadside collision possible.   Get a dashcam (searching now for the best I can afford at the moment)  -  Research your insurance company before you buy  -  Pay for total car check before you go and see a car and take someone with you if you are not confident in your ability to assess a vehicle.      Thank you to everyone here who volunteers their time, energy and information, it is greatly appreciated.  You helped my sister with some advice a while ago but we weren't able to follow through, she is struggling with long term health conditions and I ended up in hospital for a while with myocarditis, when I got out and remembered it was too late.  I am going to make a donation now, it is not a lot, I wish I could give more, I will try to come back when things are on a more even keel.    Take care
    • It seems the solicitor has got your case listed for this “appeal” but not for the Stat Dec(SD). You need to ensure you can perform your SD on the day. If you are able to make your SD in court, the situation you are in now is more straightforward than if you made your SD via a solicitor. You have been convicted of two offences (and two were dropped) via proceedings of which you were not aware. The way to remedy that is to perform an SD. No appeal is necessary (nor is it available via the magistrates’ court). If you are able to make your SD this is how I see it panning out: You will make your SD to the court. The court must allow you to make it as it will have been made within 21 days of you discovering your convictions. You will then be asked to enter pleas to the four charges again. At this point you should plead not guilty to all four but make the court aware that you will plead guilty to the speeding charges on the condition that the FtP charges are dropped. The prosecutor will be asked whether or not this is agreed. In my opinion the overwhelming likelihood is that it will be. If it is you will be sentenced for the two speeding offences under the normal guidelines. In the unlikely event it is not accepted,  the speeding charges will be withdrawn (they have no evidence you were driving). You have no viable defence to the FtP charges and so should plead guilty. This will mean 12 points and a “totting up” ban (as you have already suffered). You can present an “Exceptional Hardship” argument to try to avoid this (explained below).   Because of this, I don’t see any need to make an argument to ask to have any ban suspended (pending an appeal to the Crown Court) unless and until you are banned again. The only reason I can think the solicitor suggested this is to secure a (Magistrates')  court date. I was surprised when you said you had an appointment so quickly; a date for an SD usually takes longer than that. However, if you can use it to your advantage, all well and good. I can’t comment on the argument that the two speeding offences were committed “on the same occasion” as I don’t have the details. That phrase is not defined anywhere and is a matter for the court to decide. It’s an interesting thought (and only that) that such an argument could equally be made for the two FtP offences. If the requests for driver’s details arrived at your old address at the same time, with the same deadline for reply, it could be argued that you failed to respond to hem both “on the same occasion” (i.e when the 28 days to respond expired) and so should only receive penalty points for one. Hopefully you won’t need to go there. I think you have information about avoiding a “totting up” ban. But here’s the magistrates’ latest guidance on "Exceptional Hardship" (EH) which they refer to: When considering whether there are grounds to reduce or avoid a totting up disqualification the court should have regard to the following: It is for the offender to prove to the civil standard of proof that such grounds exist. Other than very exceptionally, this will require evidence from the offender, and where such evidence is given, it must be sworn. Where it is asserted that hardship would be caused, the court must be satisfied that it is not merely inconvenience, or hardship, but exceptional hardship for which the court must have evidence; Almost every disqualification entails hardship for the person disqualified and their immediate family. This is part of the deterrent objective of the provisions combined with the preventative effect of the order not to drive. If a motorist continues to offend after becoming aware of the risk to their licence of further penalty points, the court can take this circumstance into account. Courts should be cautious before accepting assertions of exceptional hardship without evidence that alternatives (including alternative means of transport) for avoiding exceptional hardship are not viable; Loss of employment will be an inevitable consequence of a driving ban for many people. Evidence that loss of employment would follow from disqualification is not in itself sufficient to demonstrate exceptional hardship; whether or not it does will depend on the circumstances of the offender and the consequences of that loss of employment on the offender and/or others. I must say, I still do not understand what the solicitor means by “As a safeguard we have lodged the appeal and applied to suspend your ban pending appeal due to the time limit for being able to automatically appeal without getting leave of the Judge.” When they speak of “leave of the judge” I assume they mean they have lodged an appeal with the Crown Court. I don’t know what for or why they would do this. It seems to follow on from their explanation of the “totting up” ban. If so, I’m surprised that the Crown Court has accepted an appeal against something that has not yet happened. But as I said, i is no clear to me. Only you can decide whether to employ your solicitor to represent you in court. If it was me I would not because there is nothing he can say that you cannot say yourself. However, I am fairly knowledgeable of the process and confident I can deal with it. That said, I do have a feeling that the solicitor is somewhat “over egging the pudding” by introducing such things as appeals to the Crown Court which, in all honesty, you can deal with if they are required. I can only say that the process you will attempt to employ is by no means unusual and all court users will be familiar with it. I can also say that I have only ever heard of one instance where it was refused. In summary, it is my view that it is very unlikely that your offer to do the deal will be refused. If it is accepted, you may be able to persuade he court that the two speeding offences occurred "on the same occasion" and so should only receive one lot of points. Let me know the details (timings, places, etc) and I'll give you my opinion. Just in case your offer is refused, you should have your EH argument ready. Whether it's worth paying what will amount to many hundreds of pounds to pay someone to see this through is your call.  Let me know if I can help further.    
  • Recommended Topics

  • Our picks

    • If you are buying a used car – you need to read this survival guide.
      • 1 reply
    • Hello,

      On 15/1/24 booked appointment with Big Motoring World (BMW) to view a mini on 17/1/24 at 8pm at their Enfield dealership.  

      Car was dirty and test drive was two circuits of roundabout on entry to the showroom.  Was p/x my car and rushed by sales exec and a manager into buying the mini and a 3yr warranty that night, sale all wrapped up by 10pm.  They strongly advised me taking warranty out on car that age (2017) and confirmed it was honoured at over 500 UK registered garages.

      The next day, 18/1/24 noticed amber engine warning light on dashboard , immediately phoned BMW aftercare team to ask for it to be investigated asap at nearest garage to me. After 15 mins on hold was told only their 5 service centres across the UK can deal with car issues with earliest date for inspection in March ! Said I’m not happy with that given what sales team advised or driving car. Told an amber warning light only advisory so to drive with caution and call back when light goes red.

      I’m not happy to do this, drive the car or with the after care experience (a sign of further stresses to come) so want a refund and to return the car asap.

      Please can you advise what I need to do today to get this done. 
       

      Many thanks 
      • 81 replies
    • Housing Association property flooding. https://www.consumeractiongroup.co.uk/topic/438641-housing-association-property-flooding/&do=findComment&comment=5124299
      • 161 replies
    • We have finally managed to obtain the transcript of this case.

      The judge's reasoning is very useful and will certainly be helpful in any other cases relating to third-party rights where the customer has contracted with the courier company by using a broker.
      This is generally speaking the problem with using PackLink who are domiciled in Spain and very conveniently out of reach of the British justice system.

      Frankly I don't think that is any accident.

      One of the points that the judge made was that the customers contract with the broker specifically refers to the courier – and it is clear that the courier knows that they are acting for a third party. There is no need to name the third party. They just have to be recognisably part of a class of person – such as a sender or a recipient of the parcel.

      Please note that a recent case against UPS failed on exactly the same issue with the judge held that the Contracts (Rights of Third Parties) Act 1999 did not apply.

      We will be getting that transcript very soon. We will look at it and we will understand how the judge made such catastrophic mistakes. It was a very poor judgement.
      We will be recommending that people do include this adverse judgement in their bundle so that when they go to county court the judge will see both sides and see the arguments against this adverse judgement.
      Also, we will be to demonstrate to the judge that we are fair-minded and that we don't mind bringing everything to the attention of the judge even if it is against our own interests.
      This is good ethical practice.

      It would be very nice if the parcel delivery companies – including EVRi – practised this kind of thing as well.

       

      OT APPROVED, 365MC637, FAROOQ, EVRi, 12.07.23 (BRENT) - J v4.pdf
        • Like
  • Recommended Topics

Received Court Claim from Builder


HP Mum
style="text-align: center;">  

Thread Locked

because no one has posted on it for the last 2048 days.

If you need to add something to this thread then

 

Please click the "Report " link

 

at the bottom of one of the posts.

 

If you want to post a new story then

Please

Start your own new thread

That way you will attract more attention to your story and get more visitors and more help 

 

Thanks

Recommended Posts

My 2 pennies on this as a former professional builder.

He doesn't need to be an architect to draw plans, especially for planning permission; I have done them myself many many times and they were accepted by the planning dpt.

Personally I have always done detailed quotes and sketches for free, hoping to get a contract.

To clarify though, these initial sketches were just that, sketches done by hand to show the customer what would be done, not good for submission for a planning application.

Any builder charging for quotes is taking the Mick imo.

I think he's only chancing it after such long time.

I would reply referring to the plans not being fit for purpose and then let him argue his point in court.

The judge will surely ask why he waited so long to pursue.

Link to post
Share on other sites

  • Replies 86
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Thank you king - and especially from a builder's perspective.

 

The form I have been sent is from Northants County Court Business Centre. He is a business; I am not.

Acknowledgement of Service

+

Admission Form N9A.

Defence and Counterclaim Form N9B

 

The form N9A has 2 sides asking for personal details - money/ employment/ dependents etc - If I do not intend to Admit then do I NOT fill in this page??

 

The form N9B Defence/ Counterclaim - is this the one I only fill in?

 

I have not appointed another builder - yet. So do I assume I can't fill in the counterclaim section - yet - for someone else to do the job properly?

If things go well in my life over the next 2 weeks I could.

 

It says 14 days to reply from date of service. 9th issue date. So by when does that mean I need to reply? 23rd? Or is it working days?

 

Then do I have 28 days to file a Defence from the 9th? What date does that make it?

Link to post
Share on other sites

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

Thanks Andy for the update

 

So - 5 + 14 days = by 27th for Acknowledment / + 14 days = by 10th for Defence

Better get working on my Defence quickly. Time will fly pass I am sure. And I guess - I'd better get other builder quotes for the work he did do (+ what he should have done and didn't) as possible counter-claim??

Link to post
Share on other sites

Yes if you intend counter claiming

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

Just filling in the Acknowledgment of Service form.

 

Can I first - and now - just file the AoS - form N9 SDT ??

 

And then I have the next 14 days to fill out the Defence and Counterclaim form N9B (SDT)?? as per my post #30

Or do I have to file them both on-line at the same time?

 

I think I just have to file the AoS now and can use the next days to compile my defence (and possible counter claim...)

Hope this is correct as I am not ready with my defence notes

 

Am a little bit confused because N9 and N9B were in the same envelope.

Link to post
Share on other sites

Just filling in the Acknowledgment of Service form.

 

Can I first - and now - just file the AoS - form N9 SDT ?? Yes...work from the issuance date...19 days from and including the date to AoS and then a further 14 days to submit your defence...33 days

 

And then I have the next 14 days to fill out the Defence and Counterclaim form N9B (SDT)?? as per my post #30

Or do I have to file them both on-line at the same time? Was the claim issued on line MCOL Northampton ?

 

I think I just have to file the AoS now and can use the next days to compile my defence (and possible counter claim...)

Hope this is correct as I am not ready with my defence notes

 

Am a little bit confused because N9 and N9B were in the same envelope.

N9 is the AoS and N9b is Defence and Counterclaim.

 

Also - if the claim was issued out of Northants - do I contest jurisdiction of the court? Or can that wait until they assign a court?

Not quite sure what this means?

 

No...ignore Jurisdiction...you reside in the UK

 

Andy

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

Yes - claim was issued via mcol Northants

 

Ok - so just filed aos online.

 

Will start working on defence over the w/e. And will look at counterclaim too (ie the cost to get someone else to do a better job that is fit for purpose...)

Link to post
Share on other sites

  • 3 weeks later...

OK - So I need to have my Defence in by tomorrow. Going to work on it today - using all my notes.

Do I need to write every single detail now? Or will there be another step before court where I have to provide all my evidence to corroborate my Defence?

I am really pushed for time and have other very important issues to work on today - so I need to understand how brief I can be now...

Link to post
Share on other sites

Initial defence can be brief...but you must either admit or deny all points plead...anything you do not respond to will be taken as an admittance. You can expand in your witness statement later in the process...assuming they wish to continue with the claim after your initial response.

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

The PoC were 2 sentences from him.

"non-payment of invoice # xxx for services provided in relation to producing drawings. The invoice has been outstanding since x date".

The amount of the invoice was the Claim + the court fee.

 

He didn't elaborate on the services provided nor any itemisation to equal the Claim value in the PoC. Is that normal?

 

My Defence will contest the lack of itemisation and drawings not fit for purpose. His quote was large, he has apportioned this invoice with no clear itemisation how he arrived at the end figure. Looking at his quote, certainly it seems that the drawings element should have been at a much lower cost. But part of my Defence will also be that they were not suitable for my purposes - 'not fit for purpose'.

 

Do I have to go into the detail about why they were not fit for purpose now? Or as you said above, that will form part of my witness statement.

 

Is there a cost to file a Defence?

 

Also - I have never had confirmation back from the court that they got my Acknowledment - is that normal? I did it online

 

Also - Can I do the Defence online too?

 

I wrote a letter to the builder - to which he never responded - explaining my reasons for non-payment.

 

Could that simply be my Defence now?

 

Can I attach a word doc on-line? If so, that will save me time in re-writing!

Link to post
Share on other sites

The PoC were 2 sentences from him.

"non-payment of invoice # xxx for services provided in relation to producing drawings. The invoice has been outstanding since x date".

The amount of the invoice was the Claim + the court fee.

 

He didn't elaborate on the services provided nor any itemisation to equal the Claim value in the PoC. Is that normal? Yes he will expand in his statement

 

My Defence will contest the lack of itemisation and drawings not fit for purpose. His quote was large, he has apportioned this invoice with no clear itemisation how he arrived at the end figure. Looking at his quote, certainly it seems that the drawings element should have been at a much lower cost. But part of my Defence will also be that they were not suitable for my purposes - 'not fit for purpose'.

Do I have to go into the detail about why they were not fit for purpose now? Or as you said above, that will form part of my witness statement. Statement

 

Is there a cost to file a Defence? no

 

Also - I have never had confirmation back from the court that they got my Acknowledment - is that normal? I did it online

You dont get one...only after your defence

 

Also - Can I do the Defence online too? Yes

 

I wrote a letter to the builder - to which he never responded - explaining my reasons for non-payment. Could that simply be my Defence now? Is it in the particulars ? Can I attach a word doc on-line? No If so, that will save me time in re-writing!

 

Andy

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

The builder never referred to my letter in his PoC

 

When he advised he was due to make a claim if I didn't pay his old invoice I resent him the letter I had sent 1.5y ago.

He never acknowledged my letter or responded to my comments/ complaints. He just made a claim.

The contents of the letter are actually pretty much my Defence

Link to post
Share on other sites

Also - Can I do the Defence online too?

 

I wrote a letter to the builder - to which he never responded - explaining my reasons for non-payment. Could that simply be my Defence now? Can I attach a word doc on-line? If so, that will save me time in re-writing!

 

The builder never referred to my letter in his PoC

 

When he advised he was due to make a claim if I didn't pay his old invoice I resent him the letter I had sent 1.5y ago.

He never acknowledged my letter or responded to my comments/ complaints. He just made a claim.

The contents of the letter are actually pretty much my Defence

 

Then it cant go in your defence......back to your first post today and my response.....initial defence simply respond to the pleadings and the rest goes into the statement later.

We could do with some help from you.

PLEASE HELP US TO KEEP THIS SITE RUNNING EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHER

 

Have we helped you ...?         Please Donate button to the Consumer Action Group - The National Consumer Service

If you want advice on your Topic please PM me a link to your thread

Link to post
Share on other sites

Do I need an actual cost for a counter claim? Or can it be an estimate?

I have got quotes from many different builders and architects for the same jobs he quoted for. They do vary and I have not done the work yet

Link to post
Share on other sites

Thanks Mariner - not sure I totally understand that though?? Do you mean I can add in costs to work on my Defence?

I was thinking more along the lines of the costs to re-appoint a different company to do the drawings again.

 

If I don't add a cost for re-doing now, is it that I won't be able to reclaim these costs later?

 

 

So, for example, the judge may say - he did do the provisional drawings, for which there is a cost element.

My argument would be that yes he did the drawings, but I can't use them for planning as they were not complete nor suitable for my project (eg: did not include one floor, for which I would need Planning Permission Application to Council) - and I will have to appoint a different company to re-do the job - and I will have to pay for this new service.

 

A Judge may say that the new company could use this builder's provisional drawings?

One new company I approached said they could possibly use this builder's drawings and elaborate on them to include the other areas he didn't do.

So, looking at that possible Judge angle, it would seem to be prudent to add in 2 costs - one for a company to completely re-do; the other for a company to use this builder's drawings and improve. Can I do that?

 

Or would it be best to simply Counter Claim for the same amount he is claiming?

 

Just trying to get my head round the best route.

 

In the meantime I am drafting my Defence to file this am.

Link to post
Share on other sites

Sorry to pop in here at this very late stage, but I understand that one of the issues is that the original agreement was to produce a particular set of drawings relating to an entire property and in the event, the drawings only related to part of the property and they were therefore incomplete.

 

Is this correct?

 

If it is correct then one of your very strong heads of defence in addition to the poor quality of the work is that the plans which were eventually submitted were incomplete and that the contract is not a severable contract and therefore the claimant is not entitled to levy a pro rata charge as it is not possible to have a new planner simply add the missing parts to the drawings by by the claimant and the project would have be started again from scratch.

 

Please excuse me if I have got the wrong end of the stick

 

I suggest that you post up your completed defence here in PDF format before filing it

Link to post
Share on other sites

Link to post
Share on other sites

Just going through my notes and earlier posts here:

 

He quoted a 'fixed fee' - which he wrote would be for: measuring, discussing options, submitting a pre-application to council *, submitting a detailed planning statement outlining the proposals in accordance with planning policy docs and relevant planning history of the area*, doing some initial simple building work*. *= not done

 

All of this he suggested would be £3.6k +vat. I did not approve the drawings / he didn' do any other part of his quote.

 

Yet he still sent in an invoice for 50% value of the quote.

 

An earlier comment said: I need to point to some way in which he is in breach of contract due to his services not being up to scratch. For example, if he agreed to do plans for submission to the planning authorities but the plans are no good for that purpose, then his work product is not fit for purpose.

 

So perhaps a simple Defence now based on those points?

 

Thanks Bank Fodder

I have an existing 3 floor property with a demised 4th floor roof terrace.

Proposal to add a storey on the 4th floor terrace & dig a basement.

 

He did drawings for the 3 floors - he did not provide existing drawing of the 4th floor terrace nor proposed.

 

I understand you can't draw in an existing basement as it is not dug out yet - yet he did not do a proposed drawing using the space below the g/f.

 

Part of his quote - mentioned in post 48 - was to be prepared for Pre-Planning.

The drawings he presented were internal changes that would not have needed Pre-Planning. The 4th floor storey extension and basement dig would need Pre-Planning and Full PP - and this was not provided in his drawings.

 

So - yes - the drawings were incomplete.

 

I will read the link you just provided now

Link to post
Share on other sites

Please have a look at the draft defence below and let us know if you think it covers all the points, if it is correct and you agree with it.

 

Please suggest any other matters that you think may have been omitted.

 

Don't forget that there is a character limit on the MCOL website

 

  1. The claimant's claim is denied
  2. The claimant undertook to carry out certain works in relation to a proposed building project on the XXX date XXX
  3. The claimant's proposal itemised the work to be carried out and made it clear that the said works were for a "fixed fee" of £3600 plus VAT.
  4. The claimant only partially completed the work which he had agreed to do.
  5. The claimant is now attempting to suggest that the contract is severable and he is trying to impose what he considers to be a pro rata fee.
  6. The contract is not a severable contract.
  7. In any event the partial work which has been tendered is of very poor quality.
  8. The defendant made clear her objection to the submitted work on XXX date XXX

 

Link to post
Share on other sites

For the record - the "simple building work" he mentioned in his quote, and wanted to charge at his usual hourly rate of £150/h - was not simple at all.

 

Briefly - I was creating 2 properties out of 1.

 

I'm not a builder but I itemised what needed to be done (he hadn't) and set about preparing and then doing some of the work myself - separating utilities - with the help of an electrician and plumber & BT engineer. It took weeks.

 

As a project manager, he must have known that my ideas translated into work was not "simple building work". It would have been madness to be paying £150/h for the work that needed to be done.

 

I wanted to brick up doors between one building and the other, cut holes in floors and add a staircase - when I researched it I understood I needed a structural engineer - for appropriate RSJ's, lintels etc. These costs were not even intimated in his quote.

 

I wised up whilst doing the above.

Realised that if I was not on top of the project I was going to be ripped off by my ignorance.

 

Gosh - Thanks BankFodder. I would have waffled!

 

So:

1. The claimant's claim is denied YES

2. The claimant undertook to carry out certain works in relation to a proposed building project on the XXX date XXX YES

3. The claimant's proposal itemised the work to be carried out and made it clear that the said works were for a "fixed fee" of £3600 plus VAT. He listed jobs that had to be done, but did NOT itemise the components of the jobs. He said additional costs would be incurred, ie the £150/h simple building work (which wasnt simple)

4. The claimant only partially completed the work which he had agreed to do. YES - he didn't include 2 areas

5. The claimant is now attempting to suggest that the contract is severable and he is trying to impose what he considers to be a pro rata fee. YES. The % of work he did does not equal 60% of the 'fixed fee'

6. The contract is not a severable contract. Yes, based on what you just advise?

7. In any event the partial work which has been tendered is of very poor quality. YES

8. The defendant made clear her objection to the submitted work on XXX date XXX YES

Link to post
Share on other sites

Please can you reproduce here in bullet pointed form the jobs that had to be done and whether or not he did those jobs

Link to post
Share on other sites

OK

 

Intro letter where he offered services to:

assist in subdivision of a property, including a basement floor & refurbishment of new building

 

He confirmed from our talks that I wanted him to provide a fee quotation for:

- producing existing and proposed drawings of the addition, including the terrace, g/f garage & basement under garage in relation to its development

 

His fixed fee (stage 1) includes:

- discussing various options

- when have an option that I like, he will submit a pre-application

- submitting a detailed planning statement outlining the proposals, in accordance with

 

Planning Policy docs and relevant planning history of the area

- he would need to deal with the subdivision on the property to form a separate property, as required by Planning Regs.

- confirmed his fee for carrying out this element would be £3.6k

 

He submitted further Stages, but they are not relevant here.

 

He didnt include the terrace or the basement in his drawings

 

Yes we discussed.

 

We never got beyond his first drawings - they didn't include the 4th floor terrace or the basement and I didn't like his proposal internal drawings for the existing 3 floors.

 

no pre-planning application, no detailed planning statement, no dealing with the sub-division

 

In his Intro Letter, where he wrote:

he would need to deal with the subdivision on the property to form a separate property

 

"needing to deal with" meant that he wrote separately that he would charge £150/hour for this simple subdivision.

 

Yet he did not itemise what had to be done to sub-divide.

I did that itemisation and (some of the) work myself - and it took weeks.

 

he included it in his £3.6k quote - yet then said it would cost more

 

Hi Bankfodder - do you think its ok to file what you composed for me?

Or does it need tweeks due to my subsequent posts?