    • next time dont upload 19 single page pdfs use the sites listed on upload to merge them into one multipage pdf.. we aint got all day to download load single page files 2024-01-15 DBCLegal SAR.pdf
    • If you have not kept the original PCN you can always send an SAR to Excel and they have to send you all the info they have on you within a month. failure to do so can lead to you being able to sue them for their failure.......................................nice irony.
    • Thank you and well done  for posting up all those notices it must have have taken you ages.. The entrance sign is very helpful since the headline states                    FREE PARKING FOR CUSTOMERS ONLY in capitals with not time limit mentioned. Underneath and not in capitals they then give the actual times of parking which would not be possible to read when driving into the car park unless you actually stopped and read them. Very unlikely especially arriving at 5.30 pm with possibly other cars behind. On top of that the Notice goes on to say that the terms and conditions are inside the car park so the entrance sign cannot offer a contract it is merely an offer to treat. Inside the car park the signs are mostly too high up and the font size too small to be able to read much of their signs. DCBL have not shown a single sign that can be read on their SAR. Although as they show photographs which were taken the year after your alleged breach we do not know what the signs were when you were there. For instance the new signs showed the charge was then £100 whereas your PCN was for £85. Who knows, when you were there perhaps the time was for 3 hours. They were asked to produce  planning permission which would have been necessary for the ANPR cameras alone and didn't do so. Nor did they provide a copy of the contract-DCBL  "deeming them disproportionate or not relevant to the substantive issues in the dispute" How arrogant and untruthful is that? The contract and planning permission could be vital to having the claim thrown out. I can find no trace of planning permission for the signs nor the cameras on Tonbridge Council planning portal. and the contract of course is highly relevant since some contracts advise the parking rouges that they cannot take motorists to Court. I understand that Europarks are now running that car park which means that nexus didn't  last long before being thrown out.....................................
  • Recommended Topics

  • Our picks

    • If you are buying a used car – you need to read this survival guide.
        • Like
      • 1 reply
    • Hello,

      On 15/1/24 booked appointment with Big Motoring World (BMW) to view a mini on 17/1/24 at 8pm at their Enfield dealership.  

      Car was dirty and test drive was two circuits of roundabout on entry to the showroom.  Was p/x my car and rushed by sales exec and a manager into buying the mini and a 3yr warranty that night, sale all wrapped up by 10pm.  They strongly advised me taking warranty out on car that age (2017) and confirmed it was honoured at over 500 UK registered garages.

      The next day, 18/1/24 noticed amber engine warning light on dashboard , immediately phoned BMW aftercare team to ask for it to be investigated asap at nearest garage to me. After 15 mins on hold was told only their 5 service centres across the UK can deal with car issues with earliest date for inspection in March ! Said I’m not happy with that given what sales team advised or driving car. Told an amber warning light only advisory so to drive with caution and call back when light goes red.

      I’m not happy to do this, drive the car or with the after care experience (a sign of further stresses to come) so want a refund and to return the car asap.

      Please can you advise what I need to do today to get this done. 
       

      Many thanks 
      • 81 replies
    • Housing Association property flooding. https://www.consumeractiongroup.co.uk/topic/438641-housing-association-property-flooding/&do=findComment&comment=5124299
        • Like
      • 161 replies
    • We have finally managed to obtain the transcript of this case.

      The judge's reasoning is very useful and will certainly be helpful in any other cases relating to third-party rights where the customer has contracted with the courier company by using a broker.
      This is generally speaking the problem with using PackLink who are domiciled in Spain and very conveniently out of reach of the British justice system.

      Frankly I don't think that is any accident.

      One of the points that the judge made was that the customers contract with the broker specifically refers to the courier – and it is clear that the courier knows that they are acting for a third party. There is no need to name the third party. They just have to be recognisably part of a class of person – such as a sender or a recipient of the parcel.

      Please note that a recent case against UPS failed on exactly the same issue with the judge held that the Contracts (Rights of Third Parties) Act 1999 did not apply.

      We will be getting that transcript very soon. We will look at it and we will understand how the judge made such catastrophic mistakes. It was a very poor judgement.
      We will be recommending that people do include this adverse judgement in their bundle so that when they go to county court the judge will see both sides and see the arguments against this adverse judgement.
      Also, we will be to demonstrate to the judge that we are fair-minded and that we don't mind bringing everything to the attention of the judge even if it is against our own interests.
      This is good ethical practice.

      It would be very nice if the parcel delivery companies – including EVRi – practised this kind of thing as well.

       

      OT APPROVED, 365MC637, FAROOQ, EVRi, 12.07.23 (BRENT) - J v4.pdf
        • Like
  • Recommended Topics

Roofer did shoddy work and has now filed court claim against me


Kinger122
style="text-align: center;">  

Thread Locked

because no one has posted on it for the last 3409 days.

If you need to add something to this thread then

 

Please click the "Report " link

 

at the bottom of one of the posts.

 

If you want to post a new story then

Please

Start your own new thread

That way you will attract more attention to your story and get more visitors and more help 

 

Thanks

Recommended Posts

Kinger

 

Not getting much time to post on here lately....... the order is really an interim remedy, both sides should attempt to comply as far as is possible. Is the other sides counsel still instructed? It may simplify matters if all comms are via his solicitor.

 

Not sure you can appeal as it doesn't appear to be a final judgment in the case and is still open to applications from either side.

 

Perhaps ask building control to undertake a site visit prior to any further works so that all parties are aware of which works must be completed for later scrutiny. If that is possible I would be inclined to engage with the other sides sol and explain the course of action you expect from his client.

 

f16 asked about tile type, are you able to confirm?

 

sorry for the confusion there was no solicitor. the clerk told me the person accompanying the claimant was a solicitor but it was not true. it was just an employee.

 

The Tiles are a low pitch tile certified to ten degrees. They are centurion tiles by Forticrete. flashing are also appropiate for 15 degrees and that type of tile. almost all materials were provided by myself. The claimant only provided materials to put the pitch up to 15 degrees and the finishing touches to the roof.

 

Im using a mobile so sorry for spelling

Link to post
Share on other sites

  • Replies 612
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Kinger

Could you get a couple of quotes, NOT ESTIMATES, from other roofers to remove and replace, at the correct pitch. Deduct this amount, and pay original bloke the balance, making it perfectly clear why you have deducted it. Obviously you don't want him on your property, understandably, and have lost faith in him, again, understandably!

Legally, both parties should be financially in a position they were in, before the dispute occurred.

 

 

f16, in your opinion, do you think this would be a fair way to deal with the problem, or does your question regarding the make and type if tiles have any bearings.

I think it is too late for this unfortunately. It sounds like the DJ has already decided what should happen. If kinger ignores the DJ's order he probably won't be able to recover the additional cost. The DJ has essentially given them another chance to perform the contract.

 

Kinger as previously advised you cannot recover compensation for stress/inconvenience in construction contracts, unfortunately. This type of damage is only recoverable for what are known as amenity contracts (things like holidays).

PLEASE HELP US TO KEEP THIS SITE RUNNING

EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHERS

 

Link to post
Share on other sites

I think it is too late for this unfortunately. It sounds like the DJ has already decided what should happen. If kinger ignores the DJ's order he probably won't be able to recover the additional cost. The DJ has essentially given them another chance to perform the contract.

 

Kinger as previously advised you cannot recover compensation for stress/inconvenience in construction contracts, unfortunately. This type of damage is only recoverable for what are known as amenity contracts (things like holidays).

 

So if you sign a contract saying a roof must be built at a pitch of 15 in 4 days and the builder takes months and the wrong pitch you cannot get anything for breach of contract?

 

Yet the builder reserves the right to claim full cost if he cannot gain access!!!

 

I dont understand the point of a contract if the builder can breach it and the customer has to accwpt something not agreed to yet pay the full price.

 

Would you be expected to accept and pay for a brand new car with three wheels instead of four?

Link to post
Share on other sites

Didn't someone say above it was an interim order? Would that make Kinger able to negotiate with the original roofer?

 

Is it possible Kinger could get a new watertight contract drawn up by a solicitor for the remedial works?

Link to post
Share on other sites

I think [however unfortunate the result may be], that the best short term option would be to engage with building control and agree the works to be completed. This should provide you with a reasonable excuse for delaying works without appearing obstructive until you have sight of the order.

 

My reference to interim order was essentially that the case will not be concluded on the order alone, however it is drafted it will rely on both parties undertaking a prescibed action, in the absence of which I would assume either side is at liberty to apply to the court again.

Link to post
Share on other sites

So if you sign a contract saying a roof must be built at a pitch of 15 in 4 days and the builder takes months and the wrong pitch you cannot get anything for breach of contract?

 

Yet the builder reserves the right to claim full cost if he cannot gain access!!!

 

I dont understand the point of a contract if the builder can breach it and the customer has to accwpt something not agreed to yet pay the full price.

 

Would you be expected to accept and pay for a brand new car with three wheels instead of four?

You can claim for quantifiable financial loss only, not compensation for stress or inconvenience.

 

Correct me if I'm wrong, but it sounds like the judge is making them give you what you contracted for ... but he is not allowing you to get someone else in to do the work at greater cost. As Mike said wait until you have the actual order to see exactly what you have to do.

PLEASE HELP US TO KEEP THIS SITE RUNNING

EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHERS

 

Link to post
Share on other sites

You can claim for quantifiable financial loss only, not compensation for stress or inconvenience.

 

Correct me if I'm wrong, but it sounds like the judge is making them give you what you contracted for ... but he is not allowing you to get someone else in to do the work at greater cost. As Mike said wait until you have the actual order to see exactly what you have to do.

 

The judge has said for thw pitch to remain AS IT IS.

 

The building inspector gave me the option initially that he would accept the roof at 13.5 as long as I was happy with it and the guarantee provided by the claimant. I said I was not hence the issues.

 

The judge said for the claimant to repair the roof as the claimant said it was leaking due to me deliberately tampering with it not the pitch. the judge then said to liase with building control and for the certificate to be issued. If not then come back to the judge. how I reallt don't know

 

The issue is leak or no I don't want a roof pitch less than 15 as that was not what I agreed in the first place. Do I have to accept something inferior yet pay the same price. surely if I must accept less than t15 the claimant must accept less than the contracted price.

 

This is the whole issue. the building certificate is dependant on my approval. as building control have said they will only be happy with a warranty provided by the claimant. building control were effectively doing ME a favour. I rang other building control conpanies and they said it would only be acceptable with an engineers approved drawings and plans. something which the claimant is not doing. I feel building control are being too lax here. in my opinion is should be 15 degrees or nothing. They would never let you get away without the sufficient dept for foundations.

 

Can the claimant liase with building control. I paid them and it is my house. If I refuse to accept the building certificate can that be held against me. If I am being given the choice surely it is my perogative. especially as its not at the agreed pitch. when I spoke with the building inspector he said that even if I refused it as it was being disputed it could still be issued.

 

Where is the legislation which building inspector use? how can it be so vague. Im really struggling with what to do here

Link to post
Share on other sites

Reading back, it sounds like the judge wants building control to have the final say, if they say the pitch can be at 13.5, you're stuck with it, if not it has to be done as per their specifications, which is usual practice anyway.

 

Who said in the first instance that the pitch needed to be at 15? Building control presumably, therefore it has to be 15 or they won't sign it off or shouldn't do!

Link to post
Share on other sites

Reading back, it sounds like the judge wants building control to have the final say, if they say the pitch can be at 13.5, you're stuck with it, if not it has to be done as per their specifications, which is usual practice anyway.

 

Who said in the first instance that the pitch needed to be at 15? Building control presumably, therefore it has to be 15 or they won't sign it off or shouldn't do!

 

Building control said it. the contract specified "all materials to manufacturer specifications" and I made the claimant specify it on the contract.

 

Maddie you got it on the second message. does that mean if the builder manages to stop the roof leaking and building control issues a certificate then I have no choice but to accept it?

Link to post
Share on other sites

Oh, I see. I had slightly misunderstood.

 

 

Can the claimant liase with building control. I paid them and it is my house. If I refuse to accept the building certificate can that be held against me. If I am being given the choice surely it is my perogative. especially as its not at the agreed pitch. when I spoke with the building inspector he said that even if I refused it as it was being disputed it could still be issued.

Wait until you get the interim order and see what it says.

PLEASE HELP US TO KEEP THIS SITE RUNNING

EVERY POUND DONATED WILL HELP US TO KEEP HELPING OTHERS

 

Link to post
Share on other sites

Kinger122.

Ok so the Pitch is 13 degrees, and the tiles are suitable down to 10 degrees, but you may find that you have to increase the "Overlap" of the tile the more you decrease the pitch of the roof.

So find out the manufactures fitting instructions and check the "Overlap" is correct.

Velux can NOT be fitted under 15 degrees. (exception is the flat roof unit).

Fitting them on a roof pitch under 15 degrees will nullify their guarantee.

 

The judge has said that your roofer has to give you an insurance backed guarantee, after he has completed the work and then you pay him.

If your roofer doesn't tell the insurance co about the Pitch error" he will get insurance..... But it will be worthless because he has fitted materials not to manufactures spec.

If the roofer does tell the insurer; He either won't get insurance or the policy will be "loaded". The former being more likely.

 

When the roofer gives you the "Certificate" pay NOTHING until you have it in writing from the insurer that they are aware of the "pitch error" and it is accepted

with "No exclusions"

I think you will find they "cancel the policy".That then means you pay nothing to the roofer.

Take care.

F16

Link to post
Share on other sites

Kinger, just been talking to my hubby, he's asked if it's a lean to roof?

 

yes it leans against the rear wall of my house. its a a single storey rear extension along the whole back wall of the house.

Link to post
Share on other sites

Kinger122.

Ok so the Pitch is 13 degrees, and the tiles are suitable down to 10 degrees, but you may find that you have to increase the "Overlap" of the tile the more you decrease the pitch of the roof.

So find out the manufactures fitting instructions and check the "Overlap" is correct.

Velux can NOT be fitted under 15 degrees. (exception is the flat roof unit).

Fitting them on a roof pitch under 15 degrees will nullify their guarantee.

 

The judge has said that your roofer has to give you an insurance backed guarantee, after he has completed the work and then you pay him.

If your roofer doesn't tell the insurance co about the Pitch error" he will get insurance..... But it will be worthless because he has fitted materials not to manufactures spec.

If the roofer does tell the insurer; He either won't get insurance or the policy will be "loaded". The former being more likely.

 

When the roofer gives you the "Certificate" pay NOTHING until you have it in writing from the insurer that they are aware of the "pitch error" and it is accepted

with "No exclusions"

I think you will find they "cancel the policy".That then means you pay nothing to the roofer.

Take care.

F16

 

Thank you for your reply it has been really helpful. I called around other building control companies and they informed me that they would only pass my roof if an engineer had developed a way to prevent the risk of water ingress. I.E they made a workaround. Unfortunately they would not send me anything in writing.

 

This roofer provided no way in which he would do anything different which I am not happy with.

 

I thought about the same point regarding the insurance. They are always looking for ways to get out of paying and I wonder why they would want to insure such a risky roof. I have no experience of insurance backed guarantees. Am I right to assume that this would be a lump sum paid upfront which would have terms and conditions along with an excess and exemptions.(somewhat like a regular insurance policy)

Link to post
Share on other sites

Yes .It is a lump sum, and it may have an excess and or exclusions. ..

But those will be in the "Policy" not on the "certificate". If the roofer fails to inform the insurer of the errors and you make a claim they will reject it when they

discover the errors.

 

The problem with a low pitched roof is. A/ High winds driving the rain under the tiles. B/ Capillary action.

 

You need to get the roof tile "Spec. and fitting instructions" Not only the tile "Overlap" question ,but the lead flashing at the extensions abutment to the house may have to be increased as well.

If you look at the verge at each end of the extension you will be able to measure the "overlap" and likewise the lead flashing.

 

Do the drawings show "vent tiles and soffit vents ?

Link to post
Share on other sites

Yes .It is a lump sum, and it may have an excess and or exclusions. ..

But those will be in the "Policy" not on the "certificate". If the roofer fails to inform the insurer of the errors and you make a claim they will reject it when they

discover the errors.

 

The problem with a low pitched roof is. A/ High winds driving the rain under the tiles. B/ Capillary action.

 

You need to get the roof tile "Spec. and fitting instructions" Not only the tile "Overlap" question ,but the lead flashing at the extensions abutment to the house may have to be increased as well.

If you look at the verge at each end of the extension you will be able to measure the "overlap" and likewise the lead flashing.

 

Do the drawings show "vent tiles and soffit vents ?

 

the contract was supplied with a drawing which states all materials to manufacturer specifications. The drawing just showed that there would be flat sections around the windows. There was nothing specifying the length or size of flashings or vent tiles. I am unsure if vent tiles have been installed

 

I purchases the windows and flashings and they are not rated to less than 15 degrees. I should be getting the courts deicision shortly and I will upload it when I get it. Shall I allow this roofer to "repair" the roof now or shall I wait?

 

If you look back to the first few pages of this thread I uploaded the contract drawing

Link to post
Share on other sites

Hi Kinger122. I think Mike Hawk said wait for the court papers.

 

I've looked back on the thread but can only find a "Sketch", not a set of "Working Plans".

The "Vent tiles" will look like a "Mushroom" sticking out of a tile. Hence the nickname in the trade "Mushroom vent"

At the front edge of the roof (the eves) where the guttering is. The guttering is fitted to the "fascia board"

There is then a soffit board which is between the wall and the fascia.

This must have vents fitted to allow air up past the timbers and out of the "mushrooms"

No air circulation and the roof will "Sweat" and condensation will run down the under side of the Sarking felt.

 

IMHO. I can't see how this "roofer" is going to get this insured.

A lot of these type of insurance co.want to send out their own inspectors at various "Stages" to make sure the job is completed to a good standard.

 

How the hell can anyone see if the correct fixings (or indeed enough of them) were used on the rafters ?

Are there enough Plate ties ?....... The list is endless

That's why he won't get a proper insurance cert.

Link to post
Share on other sites

Hi Kinger122. I think Mike Hawk said wait for the court papers.

 

I've looked back on the thread but can only find a "Sketch", not a set of "Working Plans".

The "Vent tiles" will look like a "Mushroom" sticking out of a tile. Hence the nickname in the trade "Mushroom vent"

At the front edge of the roof (the eves) where the guttering is. The guttering is fitted to the "fascia board"

There is then a soffit board which is between the wall and the fascia.

This must have vents fitted to allow air up past the timbers and out of the "mushrooms"

No air circulation and the roof will "Sweat" and condensation will run down the under side of the Sarking felt.

 

IMHO. I can't see how this "roofer" is going to get this insured.

A lot of these type of insurance co.want to send out their own inspectors at various "Stages" to make sure the job is completed to a good standard.

 

How the hell can anyone see if the correct fixings (or indeed enough of them) were used on the rafters ?

Are there enough Plate ties ?....... The list is endless

That's why he won't get a proper insurance cert.

 

The sketch was all I was provided with, along with a written contract.

 

I don't think there are any vents at all. I can take pictures and upload them here if it will make things a bit easier? I can do that tomorrow afternoon.

Link to post
Share on other sites

Kinger122, Yes that would be good. Load up some of the lead flashing where the extension joins the house as well.

It's difficult to advise you without enough info.

the more Photos the better.

 

Is the ceiling "Vaulted" or "Flat" ?

Link to post
Share on other sites

The sketch was all I was provided with, along with a written contract.

 

What ???

Who carried out the calculations for "Load" to specify the size and grade of timbers used ?

Link to post
Share on other sites

[ATTACH=CONFIG]50116[/ATTACH][ATTACH=CONFIG]50117[/ATTACH][ATTACH=CONFIG]50118[/ATTACH][ATTACH=CONFIG]50119[/ATTACH][ATTACH=CONFIG]50120[/ATTACH]

Kinger122, Yes that would be good. Load up some of the lead flashing where the extension joins the house as well.

It's difficult to advise you without enough info.

the more Photos the better.

 

Is the ceiling "Vaulted" or "Flat" ?

Link to post
Share on other sites