    • I think final version of WS now prepared with exhibits added.  All numbered properly. Of course it can still be tweaked if necessary. Laura will not need it on 25 June as that is just a Preliminary Hearing for her to represent her son. But as DCBL messed up and thought it was WS time why not prepare things calmly in advance. Defendant's WS - versione 3 + attachments.pdf
    • Your case shows the idiocy of employing a solicitor to do things you could easily do yourself. Had Countryside dealt with their own case they would have entered judgement on 4 June and there would have been no way back for you. But they thought they were clever by running to Rachael and Sean of BW Legal for a more "professional" (aye, right) service.  These dodgy solicitors can only make money on private parking cases by doing everything on the ultra cheap and certainly cant check the judgement date for every single separate case. Ho!  Ho!  Ho! Anyway, glad you got the defence filed OK. The next stage is that the central bulk court will send out a simple form called a Directions Questionnaire to you and to Countrywide which is part of the allocations process to your local court.  If you read this short thread you will see all the stages of the court process  https://www.consumeractiongroup.co.uk/topic/406892-highview-parking-anpr-pcn-claimform-urban-exchange-manchester-claim-dismissed/#comments
    • It is already trespass, nothing further needed to make out trespass. Not sure where ‘interference with goods’ helps you / how you’d bring a claim for that that stops them parking there.
    • Thanks Dx,    For some further information, the holiday was booked as a package holiday for 2. One of the 2 had to be changed, and changing costs £700 for a new flight as "tickets had been issued and they cant do a name change". I cant quite figure out how compensation works for things when it comes to package holidays.    From what I can tell  - The plane was due to land in Turks and Caicos to drop off passengers, something happened during descent, resulting in technical fault.  - The rest of the original flight from Turks & Caicos -> Montego Bay was cancelled  - A New flight was put on today, which was then delayed by 1.5hrs aswell  - Hotel was provided for the night after much hassle.  - 1.5 days, 2 evenings of holiday lost  If I understand correctly, since the original flight (LHR -> Turks -> Montego Bay) was cancelled, they are both entitled to a refund on that full flight? I can't quite work out if they are only entitled to a refund for the equivalent of Turks -> Montego Bay, or for the full LHR->Turks->Montego Bay, since it was issued as one ticket/all Virgin, and they should have arrived yesterday..?)  I can't work out how to get the cost of that compensation, or whether its a set figure, and how the loss of days of holiday is factored in   I am aware:  If you received less than 14 days’ notice of the cancellation, you are generally due compensation, awarded in pounds or euros depending on where your flight was due to depart from, according to the following scale: £220 / €250 for all flights of 1,500km or less (e.g. Glasgow to Amsterdam); £350 / €400 for all flights between 1,500km and 3,500km (e.g. East Midlands to Marrakech); £520 / €600 for all other flights (e.g. London to New York). Compensation will be reduced by 50% if the arrival time of the replacement flight doesn’t exceed the arrival time of the original flight by: two hours for flights of 1,500km or less; three hours for flights between 1,500km and 3,500km; four hours for all other flights. So I "think" its £520pp for the flight part as compensation (7500km)... but some sites say its a full refund for the flight... is it both?  Thanks,  Ryan  
    • Our business was only transacted digitally as I was not in England at that time.  
  • Recommended Topics

  • Our picks

    • If you are buying a used car – you need to read this survival guide.
      • 1 reply
    • Hello,

      On 15/1/24 booked appointment with Big Motoring World (BMW) to view a mini on 17/1/24 at 8pm at their Enfield dealership.  

      Car was dirty and test drive was two circuits of roundabout on entry to the showroom.  Was p/x my car and rushed by sales exec and a manager into buying the mini and a 3yr warranty that night, sale all wrapped up by 10pm.  They strongly advised me taking warranty out on car that age (2017) and confirmed it was honoured at over 500 UK registered garages.

      The next day, 18/1/24 noticed amber engine warning light on dashboard , immediately phoned BMW aftercare team to ask for it to be investigated asap at nearest garage to me. After 15 mins on hold was told only their 5 service centres across the UK can deal with car issues with earliest date for inspection in March ! Said I’m not happy with that given what sales team advised or driving car. Told an amber warning light only advisory so to drive with caution and call back when light goes red.

      I’m not happy to do this, drive the car or with the after care experience (a sign of further stresses to come) so want a refund and to return the car asap.

      Please can you advise what I need to do today to get this done. 
       

      Many thanks 
      • 81 replies
    • Housing Association property flooding. https://www.consumeractiongroup.co.uk/topic/438641-housing-association-property-flooding/&do=findComment&comment=5124299
      • 161 replies
    • We have finally managed to obtain the transcript of this case.

      The judge's reasoning is very useful and will certainly be helpful in any other cases relating to third-party rights where the customer has contracted with the courier company by using a broker.
      This is generally speaking the problem with using PackLink who are domiciled in Spain and very conveniently out of reach of the British justice system.

      Frankly I don't think that is any accident.

      One of the points that the judge made was that the customers contract with the broker specifically refers to the courier – and it is clear that the courier knows that they are acting for a third party. There is no need to name the third party. They just have to be recognisably part of a class of person – such as a sender or a recipient of the parcel.

      Please note that a recent case against UPS failed on exactly the same issue with the judge held that the Contracts (Rights of Third Parties) Act 1999 did not apply.

      We will be getting that transcript very soon. We will look at it and we will understand how the judge made such catastrophic mistakes. It was a very poor judgement.
      We will be recommending that people do include this adverse judgement in their bundle so that when they go to county court the judge will see both sides and see the arguments against this adverse judgement.
      Also, we will be to demonstrate to the judge that we are fair-minded and that we don't mind bringing everything to the attention of the judge even if it is against our own interests.
      This is good ethical practice.

      It would be very nice if the parcel delivery companies – including EVRi – practised this kind of thing as well.

       

      OT APPROVED, 365MC637, FAROOQ, EVRi, 12.07.23 (BRENT) - J v4.pdf
        • Like
  • Recommended Topics

Somebody has covered up my water metre!


style="text-align: center;">  

Thread Locked

because no one has posted on it for the last 4878 days.

If you need to add something to this thread then

 

Please click the "Report " link

 

at the bottom of one of the posts.

 

If you want to post a new story then

Please

Start your own new thread

That way you will attract more attention to your story and get more visitors and more help 

 

Thanks

Recommended Posts

Hello everybody

 

If anybody has advice of what to do in my situation I'd really appreciate it.

 

I rent my house and so I'm not in UK. A leak developed in December and the first my tenants knew of it was when a bill for over £500 turned up in early December. My managing agent arranged for the leak to be fixed by a local public works contractor. They turned up and instead of providing us with an estimation of works as they were instructed to do, they just went ahead, got a KCC licence and did the job. The invoice for 6 hours of unapproved work comes in at £960.00.

 

In the meantime they (contractor's) decided there is a problem with the metre and Southern Water probably needed to replace the metre and so they would leave back filling the trench for that purpose. Anyway, they obviously changed their minds on that score because they returned two days later to fill in the hole.

 

Between Friday 10th to Friday 17th December, somebody (and the original works contractor says it was not them!) came to the house and completely tarmacked over the water metre.

 

The contractor says it must have been somebody under instruction from Southern Water. Southern Water say it wasn't.

 

My Southern Water bill is being kept on hold for the moment, and I am intent on not paying the contractor's their invoice until somebody takes responsibility for the metre.

 

In all of this my managing agent seems to have done nothing for the last two months, other than query the invoice and ask the contractor's who filled in the hole (for which his answer was that Southern Water must have done it). I have asked him to officially document all of this in writing to both Southern Water and the local contractor's he got onto the job. He prefers to meet with Southern Water at the site of the filled in water metre.

 

Does anybody know where I stand in all of this and what course of action I should be taking? I know that companies do not hesitate to bung you over to their debt collectors and I really don't want that.

 

Thank you for any advice at all!

 

Julia

Link to post
Share on other sites

Hello everybody

 

If anybody has advice of what to do in my situation I'd really appreciate it.

 

I rent my house and so I'm not in UK. A leak developed in December and the first my tenants knew of it was when a bill for over £500 turned up in early December. My managing agent arranged for the leak to be fixed by a local public works contractor. They turned up and instead of providing us with an estimation of works as they were instructed to do, they just went ahead, got a KCC licence and did the job. The invoice for 6 hours of unapproved work comes in at £960.00.

 

In the meantime they (contractor's) decided there is a problem with the metre and Southern Water probably needed to replace the metre and so they would leave back filling the trench for that purpose. Anyway, they obviously changed their minds on that score because they returned two days later to fill in the hole.

 

Between Friday 10th to Friday 17th December, somebody (and the original works contractor says it was not them!) came to the house and completely tarmacked over the water metre.

 

The contractor says it must have been somebody under instruction from Southern Water. Southern Water say it wasn't.

 

My Southern Water bill is being kept on hold for the moment, and I am intent on not paying the contractor's their invoice until somebody takes responsibility for the metre.

 

In all of this my managing agent seems to have done nothing for the last two months, other than query the invoice and ask the contractor's who filled in the hole (for which his answer was that Southern Water must have done it). I have asked him to officially document all of this in writing to both Southern Water and the local contractor's he got onto the job. He prefers to meet with Southern Water at the site of the filled in water metre.

 

Does anybody know where I stand in all of this and what course of action I should be taking? I know that companies do not hesitate to bung you over to their debt collectors and I really don't want that.

 

Thank you for any advice at all!

 

Julia

 

 

Im no legal ealge here, but i take it the meter belongs to Southern Water, dispute the bill, and tell them you wnt the meter reread!! Surely the will then need to make the access to the meter. If the meter is o/side ur house on footpath, you need permission from the council to open the ground up (if im right, whereas they dont!).

 

go for that angle

Link to post
Share on other sites

I hadn't thought of taking that angle so I could do that. As it is Southern Water have been waiting for my tenants to call in a second metre reading since 12th December. I left the managing agent to handle things and it turns out that he didn't bother telling Southern Water at all that there was any kind of problem here. I've got a feeling that he really should have. I was assuming that any mess the managing agent made, then he will have to clear it up but I'm not so confident now that it will pan out that way.

 

BTW do you mean that if I need to have work on my pipes via access from the pavement then I must pay a licence but any contractor who carries out work on behalf of utilities or council does not? A KCC licence is £300!

 

Completely separate issue but why would anybody go and tarmac over a metre?

Link to post