Jump to content


  • Tweets

  • Posts

    • Please bear with me here i shall try and make this short but with all the detail, but i need help ASAP as there is limited time allowed for this process. I have been with my company 4 years and have advanced through the technical ranks to my current position,  we have an annual report which goes from 0-4 and for three years i have never scored lower than a 3. I was promoted to the role i am in now as an area quality assurance lead and the location was for the NE ( i live in the NW) eventually a similar role became available for another role in the NW. I asked my line manager if he minded me applying for it and he had no issues, i applied sat the multi stage interview and was given the role. My role is now classed as "at risk" of redundancy as we are moving from 4 regions to two which means they are also moving from 4 roles to two roles in my position. Two people are considered safe and myself and another at risk, my question is what is the criteria to separate safe from at risk . In the documentation received from my company it is below, i have zero issues and i know cv against cv mine wins, i was even selected by the company as a company mentor because of my experience in engineering and leadership. This is a closed group of maybe ten people and i am the only non senior executive included.    ·         Performance and Behaviour : I have zero behaviour issues, no issues with performance from my current line manager.  ·         Performance Improvement/ Disciplinary Records   : Zero disciplinary's and no performance issues, in fact my line manager on record has said I'm forthcoming ·         End Of Year Rating : Issues explained below Now my line manager was leaving the company and he did tell me "there was some politics involved with you getting that role, the city build manager and head of area build had promised it to their lead engineer (something they had no right to promise as it has to go though the process ) anyway from day 1 it became very clear that i would not be accepted for this reason within their community although i did just try to help them achieve quality and specification as that was my role. After a few weeks it became very apparent as to why the role had been promised to their man, i found issues where properties had been signed off as ready to accept subscribers when they were not ready (for bonus and stat reasons) and several quality issues i discovered which we could remedy and improve our productivity (unfortunately this would highlight that these issues had been there and not dealt with) My new head of area build (part of this trilogy of him, city build manager and lead engineer)  clearly did not want me there (for the reasons stated) but paid lip service, i had highlighted that i needed to walk off some structured with our canter of excellence counterparts ( as this was part of my role to link in with them for national issues) and he responded by saying i am not to walk them off, and that we have sufficient engineers to do that task (by saying this he could make sure that the engineers would take them round to structures that are A not the ones i have highlighted, and B would have very minor issues) This battle went back and forth over the months where i tried my best to build up the relationship with  them, my attitude was ok you have made some mistakes here, but we are all a team and even though you have hidden issues i can help you remedy them and hopefully we can do so and keep them off the radar,  but they just never did, So moving forward to October last year (2023) this is getting near to annual review time, now i had helped the company out massively by working a substantial amount of weekends and nights to fix issues, and i said i would take most of the time as TOIL ( as agreed with by my previous head of area build) this was 30 days. My current head of area build said i needed to put my leave in as it had been flagged as having a large amount. When i did input the leave (it would result in me taking all of December off) he was unhappy with me and was extremely curt in his responses as he could find nothing on the system for my TOIL , i explained the situation, my line manager would ask if i could work the hours, i would, and when i wanted leave he would authorise (we had an good working relationship, he was an excellent manager) he ended up going to HR to ask their advice and a teams call was set up with myself, head of area build and HR, it was confirmed by HR that it was a company error, when you want to input TOIL there should be a dropdown option in the leave menu and one of the options would be TOIL, this had not been setup on mine. So the company authorised the leave explaining that this should have been done and hadn't, i did say that this is the way it had always been and pretty much everyone on my team then operated this way, TOIL had never been discussed and none of had this option available. So i entered my leave from 4th December - 2nd January,  My line manager was an outside contractor and was leaving the company on the 15th December. On my return i found that we had a new head of area build, it would be a temporary position as they were not going to fill the position permanently and he would be covering his role (Scotland) and this role (NW). I contacted him to say that i had not received my end of year report yet and when would this happen as i had not sat with my line manager tor mine. A little over a week later my HoAB and i had a teams call, it was a introduction meeting and end of year report, he said that he had received feedback from the outgoing manager and he had given me a 2 (i have as explained before never scored lower than a 3) he asked hoe long i had been in the current role (just over a year) as this grade can mean you are new to the role and need a little supervision, haven't built up relationships with stakeholders etc. So he explained what my grade and bonus would be and if i had any feedback, i explained that this was unfair, i had proof that i had not met my targets (i say targets as there were never really any set, but going from emails and conversation we have had, and the job description) i had even created Powerpoint presentations which were very complex into how our network works from beginning to end  as there was distinct lack of knowledge here and i am a lead trainer / assessor (this btw he was extremely impressed with) He did say he had spoken to people in the centre of excellence which o believe was the head of operations, and he did look confused as to the disparity in feedback from them and the original manager that wrote my report. I contacted HR to raising my concerns that i had not sat with my line manager to go through my report,  had i had the chance to do so, i could have rebutted anything said as i had proof of my achievements even though he had set no defined targets, i could prove that i had been extremely active in identifying and remedying issues, HR did come back to me and these are their comments  1) "Your rating was submitted by your manager at the time xxx xxxxxx and he should have carried out an EOY review with you. The rating would not have been provided in this review but feedback should have been shared" [this never happened] 2)  Initial ratings where then discussed and reviewed during a calibration process (for your team) this will have included HOABs and RDs. During this session ratings can be challenged and changed. I can confirm that your rating was not changed as a result of this session and it remained at the rating that xxx submitted. 3) xxx did provide thorough feedback to xxx xxx in a handover so if not already done so it may be worth speaking with him to understand that feedback further.   4) In terms of reputation and the concern you share – ratings are not made public and are private to each individual. 5) And this first line obviously is incorrect " As far as i can see this would be the only separator they could have measured me on to separate safe from not safe, and if so the company did not follow its own procedure. My current line manager said " an error had occurred as you had not received the option to  sir with your manager for your review, and the company needs to make sure this error does not happen again) Well then they are admitting there was an issue and it needs remedying not sweeping under the carpet. All of this is documented. To remind the rating of a 2 is not a concerning grade. Please see descriptor below Generally, needs little supervision but does on occasion require direction/supervision. Does not always anticipate changes to the work environment and could adapt more quickly. May be seen as a strong performer in certain situations or by some audiences but may not perform at that level in all situations. May need some development or guidance to carry out some elements of role. May not consistently demonstrate the right behaviours. May have been on Performance Improvement during the year but has since shown strong improvement        
    • Also, what is the value of the dress and have you refunded the purchaser?
    • Simon Case was at the Covid inquiry yesterday. Finally. ‘Eat out to help out’ launched without telling official in charge, Covid inquiry hears | Covid inquiry | The Guardian WWW.THEGUARDIAN.COM Simon Case, who was responsible for Covid policy at time, calls Boris Johnson’s Downing Street the ‘worst governing ever seen’  
    • I think for the moment you will have to wait for the return of the dress to you And then take some decent photographs which will show the damage very clearly. You will have to provide these to parcel to go but also you will need them as evidence for the court if that's the way this matter goes . Let us know when you get the dress and you have the photographs. It would be helpful to see the photographs here. In the meantime I suggest that you start reading as many of the stories on the subforum as you can manage in 2 or 3 days and that means quite a lot. In particular read the pinned posts at the top of the subforum which will explain the principles involved which you will probably have to use if you bring the matter to court. When you have done the reading, when you have received the dress and when you have the photographs then come back here and we can go to the next step      
    • Solid blocks of text are very difficult for people to follow and especially when they are using small screens such as telephones. This discourages people from giving you the kind of help that you need. Please will you make sure that your posts are properly spaced and punctuated in future.  I have done this one for you on this occasion
  • Recommended Topics

  • Our picks

    • If you are buying a used car – you need to read this survival guide.
      • 1 reply
    • Hello,

      On 15/1/24 booked appointment with Big Motoring World (BMW) to view a mini on 17/1/24 at 8pm at their Enfield dealership.  

      Car was dirty and test drive was two circuits of roundabout on entry to the showroom.  Was p/x my car and rushed by sales exec and a manager into buying the mini and a 3yr warranty that night, sale all wrapped up by 10pm.  They strongly advised me taking warranty out on car that age (2017) and confirmed it was honoured at over 500 UK registered garages.

      The next day, 18/1/24 noticed amber engine warning light on dashboard , immediately phoned BMW aftercare team to ask for it to be investigated asap at nearest garage to me. After 15 mins on hold was told only their 5 service centres across the UK can deal with car issues with earliest date for inspection in March ! Said I’m not happy with that given what sales team advised or driving car. Told an amber warning light only advisory so to drive with caution and call back when light goes red.

      I’m not happy to do this, drive the car or with the after care experience (a sign of further stresses to come) so want a refund and to return the car asap.

      Please can you advise what I need to do today to get this done. 
       

      Many thanks 
      • 81 replies
    • Housing Association property flooding. https://www.consumeractiongroup.co.uk/topic/438641-housing-association-property-flooding/&do=findComment&comment=5124299
      • 161 replies
    • We have finally managed to obtain the transcript of this case.

      The judge's reasoning is very useful and will certainly be helpful in any other cases relating to third-party rights where the customer has contracted with the courier company by using a broker.
      This is generally speaking the problem with using PackLink who are domiciled in Spain and very conveniently out of reach of the British justice system.

      Frankly I don't think that is any accident.

      One of the points that the judge made was that the customers contract with the broker specifically refers to the courier – and it is clear that the courier knows that they are acting for a third party. There is no need to name the third party. They just have to be recognisably part of a class of person – such as a sender or a recipient of the parcel.

      Please note that a recent case against UPS failed on exactly the same issue with the judge held that the Contracts (Rights of Third Parties) Act 1999 did not apply.

      We will be getting that transcript very soon. We will look at it and we will understand how the judge made such catastrophic mistakes. It was a very poor judgement.
      We will be recommending that people do include this adverse judgement in their bundle so that when they go to county court the judge will see both sides and see the arguments against this adverse judgement.
      Also, we will be to demonstrate to the judge that we are fair-minded and that we don't mind bringing everything to the attention of the judge even if it is against our own interests.
      This is good ethical practice.

      It would be very nice if the parcel delivery companies – including EVRi – practised this kind of thing as well.

       

      OT APPROVED, 365MC637, FAROOQ, EVRi, 12.07.23 (BRENT) - J v4.pdf
        • Like
  • Recommended Topics

julestoolsuk vs GMAC


JulesTools
style="text-align: center;">  

Thread Locked

because no one has posted on it for the last 6334 days.

If you need to add something to this thread then

 

Please click the "Report " link

 

at the bottom of one of the posts.

 

If you want to post a new story then

Please

Start your own new thread

That way you will attract more attention to your story and get more visitors and more help 

 

Thanks

Recommended Posts

S.A.R letter sent 04/09/06 to gmac-rfc feel free to copy/paste to suit your needs

 

 

Data Protection Act 1998

Subject Access Request

 

Dear Sir/Madam

 

ACCOUNT NUMBER [s] : xxxxxxxx

Please supply me with a complete list of transactions and charges relating to my history with your organisation within the last 12 years. Please include a copy of all data held i.e mortgage statements, charges, early repayment fees, deed fees, land registry fees etc .for the period in which I had financial dealings with you.

 

Additionally, where there has been any event in my account history over this period which has required manual intervention by any member of your staff, or any other person, I require disclosure of any indication or notes which have either caused or resulted in that manual intervention, or other evidence of that manual intervention in relation to my business with you.

 

If you are unable to supply this data because there has been no such manual intervention, then please be so kind as to confirm this in your response.

 

I enclose the statutory maximum fee of £10. May I remind you, you have 40 days in which to comply with this request. Furthermore, if I discover that you have levied disproportionate penalties against me, then I shall be reclaiming them, and also reclaiming the enclosed £10 Data Protection Act subject access request fee.

 

If there is specific information which you require in order to satisfy yourself as to my identity, please let me know by return. However, please note that the above address is the one which you previously used to communicate my private business to me and which you have hitherto found to be acceptable.

I would be happy to collect the Data from my local branch/broker.

 

 

Yours faithfully,

[ your name ]

Link to post
Share on other sites

This is a modified letter from the templates I believe.

 

You can claim the 10.00 SAR fee as part of the cost in bringing your claim. It does not form part of the actual amount claimed. So the services/penalty issue does not arise.

 

Hope this helps

 

Zoot

  • Confused 1
Link to post
Share on other sites

Zoot you have lost me ~ please enlighten me

 

On the one hand you say you can claim the fee as part of the cost in bringing your claim. So if charges are as an example 100 and S.A.R 10 then total claim = 110

 

You then say it does not form part of the actual amount claimed ~ you not going to claim 110?

 

Clearly I am missing the point you are putting accross

 

Please educate - many thanks

Link to post
Share on other sites

  • 4 weeks later...

Data Protection stuff arrived yesterday by recorded delivery , just need to find time to wade through it all.Very thourough with what they have sent me copies of EVERYTHING including little jotted notes on letters etc and presented in a lovely plastic folder,aaawwwwww bless.Will sift through everything and see what i am entitled to and re-post later

Link to post
Share on other sites

  • 2 months later...

Right the SAR has been sat gathering dust since September and my Yorkshire bank claims are drawing to a close.

Decided its finally time to look through the mountain of info they have sent me and guess what!!!!!!!!!!!!!!!!

 

From the statements I have gathered that I paid

 

REDEMPTION INTEREST OF £2608.30

and

OVERPAID REDEMPTION OF £650.96

 

So as of January 1st the prelim letter is going off to GMAC RFC .

 

Will keep everyone updated

 

Jules

Link to post
Share on other sites

  • 4 weeks later...

Hi All,

Quick update for you all

 

Sent my prelim letter to Gmac yesterday as follows

 

Request for repayment of charges

 

Dear Sir/Madam,

 

ACCOUNT NUMBER: xxxxxxxxxxx

 

 

My request

 

I am writing to ask you to refund to me the ‘Redemption Penalty’ charges which you levied on my mortgage account when I settled the balance around July 2005.

I now understand that the redemption penalty fee which you applied to my account in order for me to pay off and close the mortgageis unlawful at Common Law, Statute and recent consumer regulations. If you say that they are not, then will you please demonstrate this by letting me have a full breakdown of the costs to which you have been put as a result of me paying off my mortgage with you early, in order to reassure me that your penalties really do reflect your costs.

 

In Common Law you can only recover liquidated losses stemming from a breach of contract - that is, money which it has actually cost you to end the contract early.

 

To quote The Govan Law Centre: "charges represent a penalty and are therefore irrecoverable at common law. In the Scottish case of Castaneda and Others v. Clydebank Engineering and Shipbuilding Co., Ltd. (1904) 12 SLT 498 the House of Lords held that a contractual party can only recover damages for actual or liquidated losses incurred from a breach of contract. This is also the position in English law: Dunlop Pneumatic Tyre Co Ltd v New Garage and Motor Co Ltd [1915] AC 79."

 

Your responsibilities

 

I would draw your attention to the terms of the contract which you agreed to at the time that I opened my account. It is an implied term of that contract that you would conduct yourselves lawfully and in a manner which complies with UK law.

 

I am frankly shocked that when I settled my mortgage with you, you operated my account in this way as I had always reposed confidence in your integrity and expertise as my fiduciary.

 

I consider that your contract suggested that your redemption penalty charges are fair, legal and reasonable are deceptive and that they have deceived me into agreeing to pay them. Your concealment of the true nature of your charges has prevented me from asserting my right until now.

 

What I require

 

I calculate that you have taken £3108.67 in redemption penalty charges, which I paid at the time I settled my mortgage with you. I require you to return this sum to me.

My targets to resolve this matter

 

I hope that you will enter into a sincere dialogue with me about this matter and I am writing this letter to you on the assumption that you will prefer to do this than merely respond with standard letters and leaflets.

 

I will give you 14 days to reply to me accepting, unconditionally, my request in principle and letting me know a date by which I will receive payment.

 

If you do not respond, or you do not respond positively, within this time period, I shall send you a letter before court action giving you a further 14 days in which to reflect. I believe that these targets are more than sufficient for a large company such as yours with dedicated staff and departments.

 

After that, there will be no further communication from me and I shall issue a claim within the courts at the expiry of the second deadline .This will obviously incur further charges for which I will be seeking repayment of along with the £10 fee already paid to yourselves for the Subject Access Request I submitted.

 

Yours faithfully

 