Jump to content

kammx4

Registered Users

Change your profile picture
  • Posts

    222
  • Joined

  • Last visited

Posts posted by kammx4

  1. Please find this amended claim as requested on the 30th of October this year.

    My original claim was sent on the 29/6/2020 and not what was used on the 30th.

     

    Claim is as follows

     

    after checking all the tiles, as per Ceramics/DTW’s contract for size, colour and shade differences etc etc, it became apparent upon the grout stage of tiling, which is the final process there was a serious problem with the supplied tiles, a differing stage of staining on the edge of some tiles.

     

    After exhausting the use of the chemicals purchased by myself and supplied by ceramics/DTW ltd and upon a more thorough inspection, ie catching the tiles in a correct light at an angle the problem was revealed and using a magnifying glass tiny microscopic holes in the surface on some edges of some tiles.

     

    I have physical and pictorial evidence of this as do Ceramics/DTW and conclude the tiles supplied are not fit for purpose and the contract has been broken.

     

    We have 19 tiles in various stages of defectiveness but after two offers from Ceramics/DTW which wouldn’t cover any labour costs, and by Ceramics/DTW”s own admittance the new tiles supplied won’t match the ones we already have,  and on the bequest of Ceramics/DTW to provide three quotes to replace all the tiles, which we’ve done we conclude we need to change all the tiles to keep a continuity and perfect colour throughout our £40,000 project. 

     

    Ive draughty this so far. Look forward to your thoughts.

     

    I"ve created this  so far.

    Look forward to your thoughts.

    Claim number will be on the email to the courts.

     

    Please find this amended claim as requested on the 30th of October….pdf

×
×
  • Create New...