Re: Time Theft Hi thanks for the replies. My situation is , it is alleged I took to long to do some jobs. There is no performance schedule in place to say how long a specific type of job should or should not take. In the building trade it is not always easy to put a specific time to a job especially in maintenace work. For instance changing a lock, if it is a like for like change over I could do that job in say 15 minutes, but I would book an hour to that job. This time would include traveling to the job, sourcing the lock from stock, testing, clearing up, ect. Now if I did not have a similar lock in the stores or could not get a similar one I would have to cut the door to fit the new lock and travel to get the new lock. This time, the hours on my job sheet would be say 2 hours. Yet both the sheets would read say "repair faulty lock" The job sheet would show I used a new lock but nowhere would it show how the time difference occurred. Auditor looks at the two job sheets looks at the two jobs, sees a new lock fitted to both jobs but one took one hour the other two hours. HA! HA! he thinks Time theft.
Last edited by CHIPPY RAY; 15th July 2008 at 12:55.
|